20 Units of S13-1600kVA/13.8kV Transformers for a Cold Storage Warehouse in the USA
Project Overview
HBTP supplied 20 units of S13-1600/13.8 transformers for a large-scale refrigerated cold storage and distribution warehouse in Chicago, USA. The project represents a significant deployment in the cold storage logistics sector, requiring transformers engineered for reliable operation under demanding conditions.
Project Background
This cold storage facility maintains temperatures from -25°C to +5°C across multiple zones for frozen and refrigerated food storage. With over 100,000 pallet positions, refrigeration accounts for 70% of the electrical load, making power reliability critical to prevent product loss.
Customer Requirements
US-standard 13.8kV/480V transformers, 1600kVA capacity, S13 efficiency, design for continuous high refrigeration load, N+1 redundancy for temperature-critical operations, compliance with IEEE C57.12 and NEC, and UL listing.
Our Solution
HBTP supplied its S13-series transformers, engineered specifically for cold storage logistics applications. The high-quality CRGO silicon steel core with step-lap mitered joints minimizes no-load losses, while copper windings provide enhanced short-circuit withstand capability and long service life.
| Parameter | Specification |
|---|---|
| Model | S13-1600/13.8 |
| Capacity per Unit | 1600 kVA |
| Voltage Ratio | 13.8 / 0.48 kV |
| Cooling | ONAN |
| Efficiency | S13 |
| Standard | IEEE C57.12 |
| Voltage | US Standard |
| Load | Refrigeration 70% |
| Reliability | Temperature-Critical |
Quality & Testing
All units were UL listed and passed IEEE C57.12 standard tests. Extended load testing verified performance under continuous 70% refrigeration load profile. Redundancy configuration was tested for automatic transfer.
Delivery & Installation
The 20 units were delivered to the facility in Chicago. HBTP provided technical support for coordination with the refrigeration system controls and automatic transfer switch integration.
Project Outcomes
All 20 transformers were successfully energized and are operating at rated capacity. The project was completed on schedule, and the customer has reported excellent performance with no unplanned outages attributed to transformer equipment. HBTP's reliable power distribution solution has contributed to the project's overall success and operational efficiency.