18 Units of SCB10-1600kVA Dry-Type Transformers for Singapore Container Port
Project Overview
HBTP supplied 18 units of SCB10-1600/10 transformers for a major container terminal expansion handling 30 million TEUs annually in Singapore. The project represents a significant deployment in the container port sector, requiring transformers engineered for reliable operation under demanding conditions.
Project Background
Singapore's port infrastructure is critical to global trade. This expansion project added new automated stacking cranes and reefer container yards, requiring reliable power distribution in a tropical, high-humidity coastal environment with salt-laden air.
Customer Requirements
Dry-type transformers for indoor substation installation, 1600kVA capacity, 10kV/0.4kV ratio, suitability for 100% humidity tropical climate, IP23 protection, corrosion resistance for coastal environment, and compliance with Singapore SS standards and PUB regulations.
Our Solution
HBTP supplied its SCB10-series transformers, engineered specifically for container port applications. The high-quality CRGO silicon steel core with step-lap mitered joints minimizes no-load losses, while copper windings provide enhanced short-circuit withstand capability and long service life.
| Parameter | Specification |
|---|---|
| Model | SCB10-1600/10 |
| Capacity per Unit | 1600 kVA |
| Voltage Ratio | 10 / 0.4 kV |
| Cooling | ANAF |
| Efficiency | SCB10 |
| Standard | IEC 60076-11 |
| Climate | Tropical 100% Humidity |
| Protection | IP23 |
| Corrosion | Coastal C5-M |
Quality & Testing
All units passed humidity cycling tests to verify performance in tropical conditions. Salt spray testing confirmed corrosion resistance. Routine tests included winding resistance, turns ratio, no-load loss, load loss, and partial discharge measurements.
Delivery & Installation
The 18 units were delivered in two shipments to align with the port's phased expansion. HBTP provided installation manuals and training for the port's maintenance team.
Project Outcomes
All 18 transformers were successfully energized and are operating at rated capacity. The project was completed on schedule, and the customer has reported excellent performance with no unplanned outages attributed to transformer equipment. HBTP's reliable power distribution solution has contributed to the project's overall success and operational efficiency.
Need a Custom Transformer Solution?