15 Units of SCB12-2500kVA Dry-Type Transformers for a Logistics Distribution Center in the Netherlands

 

Project Overview

HBTP supplied 15 units of SCB12-2500/10 transformers for a large-scale e-commerce fulfillment and distribution center in Rotterdam, Netherlands. The project represents a significant deployment in the logistics distribution sector, requiring transformers engineered for reliable operation under demanding conditions.

Project Background

Rotterdam is Europe's largest port and a major logistics hub. This e-commerce fulfillment center features automated sorting systems, robotic storage, and extensive conveyor networks, requiring high-capacity, efficient power distribution. The facility targets BREEAM Excellent sustainability certification.

Customer Requirements

2500kVA high-capacity dry-type transformers, SCB12 efficiency for BREEAM compliance, design for automated sorting system loads with high harmonic content, smart energy monitoring integration, and compliance with EU Ecodesign regulations.

Our Solution

HBTP supplied its SCB12-series transformers, engineered specifically for logistics distribution applications. The high-quality CRGO silicon steel core with step-lap mitered joints minimizes no-load losses, while copper windings provide enhanced short-circuit withstand capability and long service life.

Parameter Specification
Model SCB12-2500/10
Capacity per Unit 2500 kVA
Voltage Ratio 10 / 0.4 kV
Cooling ANAF
Efficiency SCB12
Standard IEC 60076-11
Load Automated Sorting
Efficiency BREEAM Excellent
Smart Energy Monitoring

Quality & Testing

All units passed efficiency verification for BREEAM Excellent and EU Ecodesign compliance. Harmonic load testing verified performance with non-linear automated equipment loads. Smart monitoring systems were factory-tested.

Delivery & Installation

The 15 units were delivered in phased shipments to match the center's phased opening. HBTP provided energy monitoring system integration support and training.

15
Units Supplied
BREEAM
Excellent
Automated
Sorting

Project Outcomes

All 15 transformers were successfully energized and are operating at rated capacity. The project was completed on schedule, and the customer has reported excellent performance with no unplanned outages attributed to transformer equipment. HBTP's reliable power distribution solution has contributed to the project's overall success and operational efficiency.