18 Units of S11-2000kVA/33kV Transformers for an Iron Ore Processing Plant in Australia
Project Overview
HBTP supplied 18 units of S11-2000/33 transformers for an iron ore beneficiation and pelletizing plant in the Pilbara region, Western Australia. The project represents a significant deployment in the iron ore beneficiation sector, requiring transformers engineered for reliable operation under demanding conditions.
Project Background
The Pilbara region in Western Australia is one of the world's largest iron ore producing areas. This beneficiation plant crushes and processes iron ore into high-grade pellets for export. The plant operates 24/7 in a hot, dusty desert environment with heavy vibration from crushing equipment.
Customer Requirements
33kV/11kV distribution transformers, 2000kVA capacity, heavy dust protection for processing plant environment, vibration resistance for installation near crushing equipment, high ambient temperature rating, and compliance with AS/NZS standards.
Our Solution
HBTP supplied its S11-series transformers, engineered specifically for iron ore beneficiation applications. The high-quality CRGO silicon steel core with step-lap mitered joints minimizes no-load losses, while copper windings provide enhanced short-circuit withstand capability and long service life.
| Parameter | Specification |
|---|---|
| Model | S11-2000/33 |
| Capacity per Unit | 2000 kVA |
| Voltage Ratio | 33 / 11 kV |
| Cooling | ONAN/ONAF |
| Efficiency | S11 |
| Standard | AS/NZS 60076 |
| Dust | Heavy Industrial |
| Temperature | Hot Desert |
| Vibration | Crushing Plant |
Quality & Testing
All units passed dust ingress testing and vibration tests simulating crushing plant conditions. Extended high-temperature testing verified performance in the Pilbara's hot climate. Standard electrical tests per AS/NZS 60076 were performed.
Delivery & Installation
Equipment was delivered to Port Hedland and transported to the mine site. HBTP provided installation support and training for the plant's maintenance team, with a focus on dust sealing maintenance in the harsh environment.
Project Outcomes
All 18 transformers were successfully energized and are operating at rated capacity. The project was completed on schedule, and the customer has reported excellent performance with no unplanned outages attributed to transformer equipment. HBTP's reliable power distribution solution has contributed to the project's overall success and operational efficiency.